It's September again. I feel like I'm coming up for air after a year of non-stop activity. We wanted to replace the old broadloom that was coming apart, but to get to the floor in my sweetie's office, meant getting under 2 large cabinets 4 short filing cabinets and several desks full of computer equipment. The first job was building a wheeled platform to hold the filing cabinets, adding solid bases and wheels to the large cabinets, followed by adding heavy duty steel brackets to the walls to support a long countertop for the computer equipment.
We had all of our windows replaced, which necessitated moving everything away from the windows so the contractor could get in to work on them. Unfortunately most of the computer equipment was right under the window so that required rewiring the room to move the equipment to a different wall.
We intended to put down wood flooring to replace the carpeting and once everything was up on wheels, moving heavy pieces around was a lot easier. The short filing cabinets just roll under the counter top, and the tall storage cabinets can be rolled wherever we want. That left us free to start on the floors, or so we thought.
Once the carpet was ripped up in the office we discovered that the water leak from the bathroom years ago had literally rotted out the floor in the back of the closet adjacent to the bathroom. Good thing there was nothing heavy back there or it would have ended up in the kitchen downstairs! Hubby pulled out the rotting section, replaced the joists under the floor and fitted in new subflooring. Sounds easy, but he had to work inside the corner of the closet, under the dividing wall between the bathroom and bedroom, and under the side wall forming the end of the closet. There were a lot of expletives being used!
All of this, just to get to the point of putting down new flooring. We started in his office since that was where the carpeting was the worst. Once we got started, putting down the flooring took us a couple of days and wasn't that big of an ordeal. There was a lot of running up and down stairs measuring and cutting planks to length and a lot of pounding things into place with a rubber mallet, but overall not too bad. Except... hubby ended up rubbing the skin off both knees and with a really sore shoulder and pains in his neck that put him out of commission for a while.(Before someone comments to tell me that he should have used knee pads, he did, they didn't work very well.)Actually he was in agony for a while, unable to sleep for the pain. After several weeks he recovered somewhat and we went back to pick up more supplies to do the next room.
We're old and getting older and knew that this wasn't going to be a quick job, so we specifically asked before we started if the product we bought was likely to be discontinued and were assured that it was one of their most popular items. Guess what? It was being discontinued only one month after we had been assured that it would be available for a long time to come. Since we'd already done one room we had to make sure we bought enough to do the whole upstairs.
Knowing that we were going to be putting down flooring it seemed like a good time to paint the walls and move the shelves from the wall in the next bedroom where they were kind of an eyesore, into the closet to allow for more storage. Once hubby recovered enough from hauling around dozens of cases of planks, we proceeded with hardly any issues at all, except for more skinned knees, persistent pain in his shoulders and arms and the advent of heart palpitations. Two rooms down, one room and the connecting hallway to go.
After another extended rest we tackled the adjoining hallway again painting all of the walls and up into the stairwell before we started the floors. We had to invisibly connect 2 doorways into the hallway, where it just happened that the same plank had to join the office, hallway and second bedroom. It took 2 tries, but we finally got it done and then on the other side of the hallway we had to connect the bathroom doorway and the master bedroom doorway.
To complete the last room, the master bedroom, we again had to put the dresser, the large storage cabinet for my craft supplies and my bookshelf, all heavy pieces, up on wheels. Altogether hubby put 36 casters on various pieces of furniture before we were through, but we were done at the end of June. Fun and games. We ended up replacing all of the drapes and drapery hardware to finish off the facelift.
In July hubby started on a project he's wanted to make for decades, a cannonball bed. A cannonball bed is a 4 poster bed with decorative turned finials on the posts that are capped by a large round ball, like a cannonball. Not having made such a large project before, he was reluctant to spend a lot of money on wood only to find out part way through that what he had planned wouldn't work so he decided to use ordinary 2x4 studs that were cheap and easy to find.
Step 1 was to plane the broad side of the boards to make them flat and even. Step 2 planing the narrow side is trickier because when you put the narrow edge through you hope that the finish board will come out as a rectangle but it might go through an an angle and the end might look more like a diamond than a rectangle. To make sure that we had squared off corners my brilliant sweetie cut sections of threaded rod and bolted 3 boards together at either end. The bolted together planks could then be fed through the planer until all the rounded edges were cut off the narrow sides.
Step 3 was to put the straight boards down side by side and glue the edges together clamping them down with a bunch of F clamps to make one large panel. We also wrapped several short temporary boards in clear tape so that we could clamp the boards top and bottom. Without the tape these temporary boards would have stuck to the panel we were making. After drying we took off the F clamps and pried off the temporary boards. Then we put the finished panel back through the planer. Any little holes were filled with wood filler and little splinters were glued back down. One long panel done, and we started on the second, going through the same process. It took a full day to make each panel which had to be clamped and left overnight to dry.
Hubby has previously used his lathe to turn spindles for making stools, but they were narrow and he could start with square wood stock. For the bed he needed something that was 3 to 4 inches square and the stores just don't carry anything like that. As with the 2 panels we had done, we started with 3 2x4sbut this time we glued them in a block rather than a sheet. The throat of the lathe only opens up to roughly 36 inches which wasn't going to be long enough, so he decided to make the decorative finials separate and connect them with threaded rod. It not only solved the problem of the posts needing to be less than 36 inches, but it also would make the finished post stronger.
He did a trial finial just to see how hard it would be to turn a perfectly round ball, especially using cheap studs. It turned out surprisingly well and one large post was cut into 4 roughly 8 inch sections that he turned on the lathe. Making one finial was easy. It was more challenging to make 4 that looked the same. He watched several videos on the internet and decided that a precut template would help with the process. Being able to hold something against the piece he was turning to see how much more he had to take off was a lot faster then checking repeatedly with a caliper. Each finial took a day to complete and like with the panels, wood filler was used for any holes and raise slivers were glued back down before everything was sanded smooth.
The posts were made in a similar manner to the finials but the planned shape had to be modified a little as the first post going through the lathe developed a nasty splinter. Once that happened all of the posts had to be made in the same way. They were left mostly square, with the edges rounded off, a taper to a rounded foot at the bottom and a rounded taper at the top where the finials were joined. Again, each post took a day to complete.
The finials had a hole drilled up halfway through and the hole was tapped for the threaded rod. Likewise the posts had a drilled and tapped hole for the other side of the threaded rod. When complete the 2 pieces were screwed together.
That got 4 posts and 2 long side panels done. We still needed the headboard and the connecting panel below the headboard as well as the footboard. The panels were made in the same fashion as the earlier ones, except that for the headboard and footboard we wanted wider pieces that could be cut down to a decorative edge but they couldn't be any wider that 12 inches in order to fit through the planer.
Carboard was used to make a template for the decorative border which was then drawn right onto the wood. Running a 4.5 foot panel through the bandsaw is rather difficult and as usual I'm hubby's 3rd hand holding up the unwieldy end of whatever is being worked on. My brilliant other half does lots of projects that need someone holding the other end of long boards or holding extra pieces of whatever it is he's working on. So I often say we did this or that and mostly it's him doing it with me adding in a bit more to the effort where it's needed. I'm just the cheering section!
After cutting out the general shape the top edged of the head and foot were routed to give it a nice polished look. The top edges of the long boards were also rounded off since those are the bits that get leaned on getting in and out of the bed.
You'd think after that it was pretty much done, but it wasn't. Angle iron - actually it was aluminum angle stock was cut drilled and chamfered so that the pieces could be screwed together with the screws counter sunk to keep them out of the way. Five panels (2 at the head) were screwed on each side to the 4 posts so it was 10 brackets with 6 holes in each.
We assembled the whole thing and dropped in the box spring and mattress to see how it would fit, it wasn't quite right. The length was fine but it was a little too wide. It was hard to tell just how much of an adjustment fitting the posts in would add to the overall width. We had to take all of the shorter panels and cut off a bit from each side. It was fortunate that the design hubby chose could easily have that bit cut off each side or we would have had a real problem.
To hold up the box spring and mattress a board was attached at the bottom of the side panel with channels cut in this rail for the slats to lay in. After that all of the pieces were stained with gel stain which resulted in both of us feeling sick from the fumes. Bleck!! Stinky, stinky stuff.
We had to wait 24 hours to Spar Varathane it all and seal in the stink. Four coats of Spar required, with an hour between coats and since there were so many pieces we had to do one side, wait an hour, turn the panels over and do the second side and then repeat for 4 coats on each side, Since the posts would stand up we could do all sides of the posts and finials at once so they only took 4 hours to complete instead of the 8 hours needed for the panels. The rails and slats only got 2 coats since they're totally hidden.
We started this project July 25th and finished it last week. We use 32 - 8 foot long 2x4s and filled 4 large yard waste bags with sawdust in completing this project. It started out to be a fun idea, but after 30 days we just wanted to see the end of it. It's done now and I can truly say to hubby, you made your bed now lie in it! Whew!
If you're interested in woodworking projects and you'd like to see a more comprehensive story of this saga, check out hubby's web page at http://www.rsbriggs.com/bed/